Questionaire for Working Humidification Proposal
 

Name and Address of the Mill :
 
Location of the Unit :
 
E-mail Id :
 
Outside Conditions:
 
a.Maximum average dry bulb
temperature during summer
:
 
b.Corresponding wet bulb
temperature during summer
:
 
Name of the department to be humidified :
 
Size of the department :
 
Type and Material of roof :
 
Details of false Ceiling
(with height,material,insulation)
:
 
Relative humidity to be maintained in the department
(to indicate with the tolerance)
:
 
H.P of motors installed in the department(Please indicate the maximum expected) :
 
Load factor of Motors :
 
Total lighting installed in KW :
 
Maximum Occupancy in the department :
 
Type of supply of Air Ducting :
 
Ducting to run above or below false ceiling : Above Below
 
Whether possible to provide underground trenches : Yes No
   

The above details to be furnished for each department to be humidified.
 
Please also enclose the drawing/sketch showing machinery layout indicating pnuemafil.
 
Location,truss layout and tentative location for the plant house.
 
Incase plants are existing specify capacity of supply and exhaust plants and details of supply air ducting and underground trenches.